News tagged commercial-buildings
-
Hydrant Flow Testing: A Contractor’s Guide to Pitot and GPM Calculations
A field note that says “hydrant at the loading dock, 58 psi” leaves too much unanswered. The designer needs to know whether that was a static, residual, or pitot reading, which outlet was open, and its inside diameter. Without those details, the note goes back to the field. Hydrant flow testing for commercial buildings involves […] <p>The post Hydrant Flow Testing: A Contractor’s Guide to Pitot and GPM Calculations first appeared on CCR-Mag.com.</p>
Posts tagged commercial-buildings
Get full access to our construction knowledge base, latest news and updates ... Join the discussion.