Plant restricted Zones - Federation of Piling Specialists

18 February, 2021

The design, layout and operation of working areas are key to ensuring that people are segregated from the risk of: PLANNING: • Collision or entrapment from mobile plant or equipment; When planning the work, restricted zones must be considered to ensure

Piling

Geothermal-piles

Health-and-Safety

Plant-and-Equipment

1. CFA/Rigid Inclusions 2. Concrete Pump 3. LDA 4. Crawler Crane 5. Driven Piling Rigs/VCC/DCIS 6. D Wall 7. Mini Rig 8. MEWP Boom 9. MEWP Scissor Lift 10. Wheeled Loading Shovel 11. 180o Excavator 12. 360o Excavator 13. Lorry Mounted Crane 14. Forward Tipping Dumper 15. Rear Tipping Dumper 16. Telehandler 17. Rough Terrain/Industrial Fork Lift Truck 18. Overhead Gantry Crane

Attachments

  • FPS 1.pdf ( 2 MB )